PennDOT District 11 has announced that milling and paving on Route 8 in Hampton and Richland townships will begin Monday, August 10th, weather permitting.
Milling and paving operations and base repair work will occur from 6 p.m. to 6 a.m. weeknights through mid-September on Route 8 between Wildwood Road and Route 910. During base repair work, motorists will be crossed over Route 8 with a single-lane of bi-directional traffic on one side of the highway. During the milling and paving operations, a single-lane restriction will occur in each direction of Route 8. No crossovers will occur during the milling and paving operations.